Page 48

Your Build - Winter 2017

Phase3 Interior & Exterior Finishing system enhances the stunning architecture and interior design. Seamless control Integrating various control protocols into this property to ensure the building operated autonomously was a big challenge. The AV and lighting designs took Control4 architecture to a new level. Via a simple Control4 user interface and app, the client has seamless control over multi-zone audio and video systems, climate control, blinds and curtains, lighting, discrete video monitoring and door access, a remote HD ‘wildlife’ camera, and gate and door security controls. Remote monitoring of the entire property is also achieved through this set up. The Pyramid Group wanted to provide the client with the best possible audio throughout the property. With the architect and client insisting on no visible speakers in the main entrance, the integrator had to consider invisible speaker technology. This was a challenge, as some of these speakers have limitations in regards to volume and dynamics across the low end frequency range. The main living spaces feature ‘best in class’ Amina AIW750 HF and LF invisible speakers. To ensure the best possible results were achieved 48 Winter 2017 sonically, The Pyramid Group used a series of Dante linked Bose ESP DSP solutions, and applied 32 band EQ to all channels. All areas were tuned to suit the client’s love of classical music. In addition, EQs were applied to the various Bowers & Wilkins in-ceiling speakers in the bedrooms and bathrooms, as well as outdoor Sonance speakers for the terrace. A total of 39 amplifier circuits were installed. Ladies Lake was a 30-month project for The Pyramid Group from initial consultation and design, through to installation and commissioning. Managed and installed by its inhouse team of engineers, The Pyramid Group delivered its most complex and successful residential project in the UK to date. The Pyramid Group’s level of detail and project management ensured that a challenging construction was delivered to the highest possible level. The award-winning clifftop property, featuring dynamic human centric lighting has left the client delighted with the outcome. Not only does the property look amazing, it also benefits enormously from the well thought out lighting and AV systems integration. http://www.thepyramidgroup.co.uk/


Your Build - Winter 2017
To see the actual publication please follow the link above